Final Report

The final report contains the final evaluation of the existing system, the final evaluation of the proposed mechanical system, and the comparison between the two systems. The report contains the research that was performed, the reasoning behind design assumptions, and the justification for the chosen design desicions. The report posted on the left contains the entire report including appendicies, and the report on the left is only the executive summary.

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation for Mathias Kehoe. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodoliges have been incorporated into this thesis project; therefore, investigation results may vary from the original design.